Installation Guide
How to Install
Most MOORAQ lamps are plug-and-hang. They come with a ceiling canopy and adjustable cord. Installation usually takes 10–15 minutes with basic tools.
What you’ll need
Screwdriver
Drill (if new holes are required)
Wall plugs / anchors (for concrete ceilings)
Voltage tester (recommended)
Before you start
Turn OFF the main power from the circuit breaker. Do not rely on the wall switch alone.
Handle bamboo gently. Don’t press, bend, or force any part.
Installation steps
-
Fix the ceiling mounting plate using screws and anchors suitable for your ceiling type. Make sure it’s firm and level.
-
Adjust the cord length to your desired hanging height. Tighten the cord grip gently—do not over-tighten.
-
Connect the wires: Live to Live, Neutral to Neutral. Secure properly inside the canopy.
-
Attach the canopy to cover the wiring and mounting plate.
-
Install the bulb (LED only, warm white 2700K–3000K, max 15W unless specified).
-
Turn the main power back ON and test the lamp.
Important
If you’re not confident with electrical work, hire a qualified electrician.
We are not liable for damage, injury, or issues caused by improper installation.
Never use high-heat bulbs or expose the lamp to moisture during installation.
Still a doubt?
If something feels unclear, stop and don’t guess. Electrical work should be done right, not fast.
Share a photo of your ceiling point and lamp parts with us—we’ll guide you step by step.
If you’re unsure about wiring, ceiling strength, or hanging height, hire a qualified electrician. It’s safer and worth it.
Support: support@mooraq.com
Response time: Usually within 12–24 hours.